Taieri Mouth Road Speed Limit

 

 

MEMBERSHIP

 

Chairperson

Cr Mandy Mayhem

 

 

 

 

Members

Cr Andrew Simms

 

 

Cr Mickey Treadwell

 

 

Senior Officer                                               Jeanine Benson, Group Manager Transport

 

Governance Support Officer                  Lynne Adamson

 

 

 

Lynne Adamson

Governance Support Officer

 

 

Telephone: 03 477 4000

Lynne.Adamson@dcc.govt.nz

www.dunedin.govt.nz

 

 

 

 

Note: Reports and recommendations contained in this agenda are not to be considered as Council policy until adopted.

 

 


Hearings Committee

28 May 2026

 

 

ITEM TABLE OF CONTENTS                                                                                                                                         PAGE

 

1             Declaration of Interest                                                                                                                                           4

Part A Reports (Committee  has power to decide these matters)

2             Taieri Mouth Road Speed Limit - Consultation Summary Report                                                          7   

 

 

 

 

 


Hearings Committee

28 May 2026

 

Declaration of Interest

 

 

EXECUTIVE SUMMARY

1.         Members are reminded of the need to stand aside from decision-making when a conflict arises between their role as an elected representative and any private or other external interest they might have.

 

2.         Elected members are reminded to update their register of interests as soon as practicable, including amending the register at this meeting if necessary.

 

RECOMMENDATIONS

That the Committee:

a)         Notes/Amends if necessary the Elected Members' Interest Register attached as Attachment A; and

b)        Confirms/Amends the proposed management plan for Elected Members' Interests.

 

Attachments

 

Title

Page

a

Hearings Committee Interest Register

5

 

 


Hearings Committee

28 May 2026

 


 


Hearings Committee

28 May 2026

 

Part A Reports

 

Taieri Mouth Road Speed Limit - Consultation Summary Report

Department: Transport

 

 

 

 

EXECUTIVE SUMMARY

1          This report presents a summary of feedback received through a public consultation proposing to reduce the speed limit on Taieri Mouth Road from 100 km/h to 80 km/h. Consultation was carried out from 2 March 2026 to 13 April 2026.

2          The proposed speed limit reduction and public consultation were developed under the Land Transport Rule: Setting of Speed Limits 2024.

3          Consultation sought community views on three options:

·    Option 1: change the speed limit from 100km/h to 80km/h on the full length of Taieri Mouth Road (13.9 km)

·    Option 2: change the speed limit from 100km/h to 80 km/h on part of Taieri Mouth Road (6.3 km)

·    Option 3: do not change the 100km/h speed limit on Taieri Mouth Road (status quo).

4          Submissions were received primarily from residents of Taieri Mouth, Kuri Bush, Brighton, and the wider Dunedin area, as well as from organisations including Te Whatu Ora, Te Rūnaka o Ōtākou, emergency services, the Saddle Hill Community Board, and a wildlife advocacy group.

5          A total of 238 submissions were received during the consultation period. Of these submissions, 78 indicated support for Option 1 (33%), 27 indicated support for Option 2 (11%), and 133 indicated support for Option 3 (56%).

 

RECOMMENDATIONS

That the Committee:

a)    Notes the feedback received from the community through the Taieri Mouth Road Speed Limit consultation process; and

b)    Recommends a preferred option for speed management along Taieri Mouth Road to the Council; and

c)    Notes that complementary measures raised through consultation, including vegetation management, maintenance, signage, and enforcement, will continue to be considered as part of ongoing corridor management.

 

BACKGROUND

Taieri Mouth Road

 

6          The current speed limit along Taieri Mouth Road is 100 km/h. The average operating speed is 88-92 km/h.

7          Taieri Mouth Road is a rural connector route providing access between Brighton, Kuri Bush, Taieri Beach, and Taieri Mouth, and forms part of the Southern Scenic Route.

8          The road serves multiple functions including daily commuting, freight and logging transport, tourism, recreational travel, cycling, beach access, and residential access.

9          Dunedin City Council first considered reducing the speed limit on Taieri Mouth Road through the draft Speed Management Plan consulted on in 2023. During that process, 20 residents of Kuri Bush made a submission seeking a reduction in the speed limit to 80 km/h on a defined section of Taieri Mouth Road, citing safety concerns related to access, visibility, and the presence of vulnerable road users.

10        Following the introduction of the Land Transport Rule: Setting of Speed Limits 2024 (the Rule), proposed speed limit changes developed under the previous framework could not be progressed and were required to be consulted on again. Council has therefore progressed a new speed limit review for Taieri Mouth Road under the 2024 Rule in response to earlier community safety concerns.

Consultation Process

11        The Taieri Mouth Speed Limit proposal and speed setting process, including the requirement for a 6-week public consultation, was noted by Council at the 27 November 2025 Council meeting with the resolution below: 

Moved (Mayor Sophie Barker/Cr Mandy Mayhem):

That the Council:

a)  Notes the Taieri Mouth Road Speed Limit Change Consultation report.

Motion carried (CNL/2025/321)

12        The Taieri Mouth Road Speed Limit proposal was published on the Council website for consultation from 2 March until 13 April 2026. Consultation materials published included information about the role and function of the road, how the road is used, why a speed limit change has been proposed rather than any other speed management intervention, and a cost benefit analysis using the tool provided by the New Zealand Transport Authority Waka Kotahi (NZTA), as required under the Rule.

13        The consultation materials published on the Council website are included at Attachment A.

14        The promotion for the consultation included:

a.    Digital content for social media platforms

b.    A media release

c.     Advertising in print media

d.    The Dunedin City Council website

e.    Internal Dunedin City Council communication via Connect

f.     FYI Dunedin – A hardcopy monthly newsletter delivered to letterboxes citywide

g.    Letter drops to Taieri Mouth, Taieri Beach and Kuri Bush residents.

15        In addition to the above outreach, Council staff also directly contacted the Clutha District Council, the school bus operator (Go Bus), Te Rūnaka o Ōtākou, forestry companies operating using the road (Wenita and City Forests), emergency services, cycling advocacy groups, the local schools, and the Saddle Hill Community Board.

16        Although no formal submission was made, the Clutha District Council Transport Team expressed support for a speed limit reduction on the Dunedin City Council section of Taieri Mouth Road, citing the existing 70 km/h limit on Taieri Mouth Road on the Clutha side of the boundary and the significant presence of tourists and visitors using the road.

17        Submissions were collected via an online form, emails and written letters. All submissions received via letter or email have been entered into the online form.

18        Submitters were asked to select one of the three options and provide reasons for their preference, along with any additional comments or supporting information.

19      All submissions were reviewed, thematically tagged, and analysed to identify key issues, areas of agreement, and points of difference.

DISCUSSION

20        A summary of the submissions is included in Attachment B. The feedback is summarised below.

21        A total of 238 submissions were received, with 9 submitters requesting an opportunity to be heard.

22        Most submissions (97%) were from individual members of the public, with a small number from organisations, groups, and the Saddle Hill Community Board.

23        Overall support for each option was:

·    Option 1 – 78 submissions (33%)

·    Option 2 – 27 submissions (11%)

·    Option 3 – 133 submissions (56%)

24        Option 3 (no speed limit reduction) received the greatest level of support at 56%, while 44% of submitters supported some form of speed limit reduction.

25        A clear difference in preferences was observed between submitter types:

·    Organisations were more likely to support a speed limit reduction (particularly Option 1)

·    Individual submitters were more likely to support retaining the current speed limit.

26        Submitter preferences varied by location of residence:

·    Submitters from Taieri Mouth (including Taieri Beach) showed strong support for retaining the current speed limit

·    Submitters from Dunedin City (including Mosgiel) were more likely to support a full speed limit reduction.

Opposition to speed limit reduction (Option 3)

27        The most common theme raised by submitters opposing a speed limit reduction was the opinion that the road is currently safe to drive at 100 km/h.

28        Other key themes included:

·    concern that lower speed limits may lead to unsafe overtaking due to driver frustration

·    concern about increased travel times

·    preference for alternative safety measures, including maintenance, signage, vegetation management, and pull-over areas.

Support for full speed limit reduction (Option 1)

29        Submitters supporting a full reduction commonly cited safety concerns and the opinion that the road is not safe to drive at 100 km/h.

30        Other key themes included:

·    support for the safety rationale outlined in the Taieri Mouth Road Speed Limit proposal

·    safety risks for cyclists and other vulnerable users

·    risks to wildlife, particularly sea lions.

Support for partial speed reduction (Option 2)

31        Submitters supporting Option 2 generally recognised the safety issues present on Taieri Mouth Road and perceived Option 2 to be a compromise to address safety without overly impacting travel times.

32        These submissions highlighted:

·    the need to address safety concerns in specific higher-risk sections

·    balancing safety improvements with maintaining travel efficiency

·    localised concerns such as residential access, road geometry, and sightlines.

Other key themes highlighted in submissions

33        The Saddle Hill Community Board and emergency services (4 submissions total) noted that reduced speed limits may impact response times to the Taieri Mouth area. Emergency services are limited to travelling at no more than 30 km/h over the speed limit with lights and sirens on. Although emergency service vehicles have provision to exceed posted speed limits, emergency travel speeds are unlikely to be safe at 30 km/h over the current speed limit (100 km/h) on Taieri Mouth Road due to the geometry, sightlines and use of the road. 

34        Approximately 19 submitters indicated a preference for reducing the speed limit within the Kuri Bush area only (covering an estimated 300 metres of road). Of these, 4 supported Option 2, while the remaining 15 preferred Option 3 (status quo). A speed limit reduction limited solely to the Kuri Bush area was not included as an option in the consultation.

35        Eight submitters noted the increased risk of, and road damage caused by, the high number of logging trucks using the road.

36        Three submitters suggested to move the 80 km/h Brighton zone to south of the Big Stone Road intersection as this intersection is perceived to be particularly dangerous.

37        Three submitters suggested speed cameras on Taieri Mouth Road as an additional safety measure.

Cost of implementation

38        The cost of implementing Option 1 (full speed limit reduction) is estimated at approximately $18,600. The cost of implementing Option 2 (partial speed limit reduction) is estimated at approximately $9,800. The cost of Option 3 (status quo) is $0.

39        Should Council approve a speed limit reduction, these costs will be funded through the existing Transport budget allocation.

OPTIONS

40        The Committee may consider the following three options in relation to speed limit changes on Taieri Mouth Road.

Option One – full speed limit reduction on Taieri Mouth Road  

 

41        Reduce the speed limit on the entire length of Taieri Mouth Road from 100 km/h to 80 km/h. This change would apply from the Clutha District Council boundary to just north of the Big Stone Road intersection. This is a 13.9 km stretch of road.

Advantages

·        Addresses safety concerns identified by submitters, including risks associated with road geometry, visibility, and improved residential and beach access

·        Aligns with submissions from organisations and groups, including those focused on road safety, health, emergency services and the local iwi.

·        Improves safety outcomes for vulnerable road users such as cyclists and pedestrians

·        Reduces the likelihood and severity of crashes, particularly on a road with mixed use and varying conditions.

Disadvantages

·        Does not align with the majority of submitters, who supported retaining the current speed limit

·        May increase travel times for commuters travelling between Taieri Mouth and Dunedin by approximately 54 seconds.

·        May require increased enforcement as drivers adjust to the new speed limit.

Option Two – speed limit reduction on part of Taieri Mouth Road

42        Reduce the speed limit on part of Taieri Mouth Road from 100 km/h to 80 km/h. This speed limit reduction would apply from the Clutha District Council boundary to just north of Kuri Bush at MacLeods Lagoon. This is a 6.3 km stretch of road.

Advantages

·        Provides a more targeted approach by addressing safety concerns in specific areas of the road

·        Reflects some submitter feedback supporting site-specific speed reductions, particularly in areas such as Kuri Bush

·        Balances safety improvements with maintaining travel efficiency along the remainder of the route.

Disadvantages

·        Does not improve safety along the entire corridor of Taieri Mouth Road, only the southern section of the road

·        Has the lowest proportion of submitter support of the three options

·        Additional speed limit changes along the route may reduce clarity and increase driver confusion.

Option Three – status quo

43        Retain the existing 100 km/h speed limit along Taieri Mouth Road.

Advantages

·        Aligns with the preference indicated by the majority of submitters (56%)

·        Maintains current travel times for regular road users

·        Avoids implementation costs.

Disadvantages

·        Does not address safety concerns raised by submitters supporting a speed reduction

·        Does not address concerns relating to residential and beach access safety

·        Does not address increased risk of fatalities and severe injury crashes, which are more likely on high-speed open roads, particularly those lacking safety barriers.

NEXT STEPS

44        Staff will prepare a report outlining the Committee’s recommendation for Council to consider and make a final decision.

45        If Council approves a speed limit change, staff will implement the decision in accordance with the Rule. This includes obtaining approval from the Director of Land Transport, updating the National Speed Limit Register, installing appropriate signage, and notifying relevant stakeholders and the community.

46        Implementation of any approved changes will be scheduled through the Transport work programme and delivered within standard timeframes for signage and minor traffic control works.

47        Post-implementation monitoring may be undertaken to assess the effectiveness of the changes and inform any future interventions. 

Signatories

Author:

Janet Young - Transport Analyst

Authoriser:

Simon Spiers - Acting Transport Strategy Manager

Jeanine Benson - Group Manager Transport

Scott MacLean - General Manager, City Services

Attachments

 

Title

Page

a

Taieri Mouth Road consultation materials

16

b

Summary of submissions

23

c

Hearings Speaking Schedule

31

 


 

SUMMARY OF CONSIDERATIONS

 

Fit with purpose of Local Government

This decision enables democratic local decision making and action by, and on behalf of communities.

This decision promotes the social well-being of communities in the present and for the future.

This decision promotes the environmental well-being of communities in the present and for the future.

Fit with strategic framework

 

Contributes

Detracts

Not applicable

Social Wellbeing Strategy

Economic Development Strategy

Environment Strategy

Arts and Culture Strategy

3 Waters Strategy

Future Development Strategy

Integrated Transport Strategy

Parks and Recreation Strategy

Other strategic projects/policies/plans

The proposed speed limit reduction supports the Council’s strategic framework by improving safety outcomes, maintaining efficient transport connections, and protecting the natural environment, with no direct impact on other strategies.

 

Māori Impact Statement

Engagement with Te Rūnaka o Ōtākou has been undertaken, and the proposed speed limit reduction supports improved safety outcomes for all road users, including Māori who are disproportionately represented in road trauma statistics.

 

Sustainability

The proposed speed limit reduction supports sustainability by improving safety for all road users, including cyclists and pedestrians, and contributing to a safer and more inclusive transport system.

 

LTP/Annual Plan / Financial Strategy /Infrastructure Strategy

There is no impact on the Long-Term Plan, Annual Plan, or Infrastructure Strategy, as implementation will be delivered within existing budgets.

 

Financial considerations

The estimated cost of implementation is approximately $18,600 (Option 1) or $9,800 (Option 2) and will be funded through the existing Transport budget.

 

Significance

The decision is considered to be of low significance, as it relates to a localised speed limit change with minimal financial impact and was subject to public consultation in accordance with the Rule.

 

Engagement – external

External engagement was undertaken through a six-week public consultation process, supported by targeted stakeholder engagement including iwi, emergency services, and key road users.

 

Engagement - internal

Internal engagement included communication through the Council intranet, inviting staff who were not directly involved in the project to provide feedback.

 

Risks: Legal / Health and Safety etc.

The proposed speed limit change is intended to reduce the severity of crashes and improve overall road safety outcomes along Taieri Mouth Road.

 

Conflict of Interest

There are no known conflicts of interest.

 

Community Boards

Taieri Mouth Road is in the Saddle Hill Community Board area. The Saddle Hill Community Board provided a submission in support of a partial speed limit reduction and participated in the consultation process.

 

 

 


Hearings Committee